The post Protect Your Family from Sharps Exposure with Medical Waste 360 appeared first on AW Sites.
Jacksonville, FL Well Abandonment Professionals
Pine lakes Golf Course WELL ABANDONMENT Completion
Job location was Pine Lakes Golf Course, call us today for a free quote….904-751-1628
The scope of work was completed for a new subdivision for DR Horton. This site is located on Jacksonville’s Northside of town off North Main Street.
7.1 INTRODUCTION
Unsealed or improperly sealed wells may threaten public health and safety, and the quality of the groundwater resources. Therefore, the proper abandonment (decommissioning) of a well is a critical final step in its service life.
Act 610, the Water Well Drillers License Act, includes a provision for abandonment of wells. This legislation makes it the responsibility of a well owner to properly seal an abandoned well according to the rules and regulations of the department. In the absence of more stringent regulatory standards, the procedures outlined in this section represent minimum guidelines for proper abandonment of wells and borings. These procedures may be applicable for, but not limited to, public and domestic water supply wells, monitoring wells, borings or drive points drilled to collect subsurface information, test borings for groundwater exploration, and dry wells (drains or borings to the subsurface).
Proper well abandonment accomplishes the following: 1) eliminates the physical hazard of the well (the hole in the ground), 2) eliminates a pathway for migration of contamination, and 3) prevents hydrologic changes in the aquifer system, such as the changes in hydraulic head and the mixing of water between aquifers. The proper decommissioning method will depend on both the reason for abandonment and the condition and construction details of the boring or well.
7.2 WELL CHARACTERIZATION
Effective abandonment depends on knowledge of the well construction, geology, and the hydrogeology. The importance of a full characterization increases as the complexity of the well construction, site geology, and the risk of aquifer contamination increases. Construction information for wells drilled since 1966 may be available from the Bureau of Topographic and Geologic Survey’s (BTGS) Water Well Inventory System database. Additional well construction data and information describing the hydrologic characteristics of geologic formations may be available from reports published by BTGS and the United States Geological Survey (USGS). Site or program records also may exist. The well should be positively identified before initiating the abandonment. Field information should be compared with any existing information.
Water levels and well depths can be measured with a well sounder or weighted tape measure. In critical situations, well construction details and hydrogeology can be determined with borehole geophysics or a downhole camera. For example, a caliper log, which is used to determine the borehole diameter, can be very helpful in locating cavernous areas in open hole wells.
7.3 WELL PREPARATION
If possible, the borehole must be cleared of obstructions prior to abandonment. Obstructions such as pumps, pipes, wiring, and air lines must be pulled. Well preparation also may involve fishing obstacles out of the borehole. An attempt should be made to pull the casing when it will not jeopardize the integrity of the borehole. Before the casing is pulled, the well should be grouted to near the bottom of the casing. This will at least provide some seal if the well collapses after the casing is pulled.
The presence of nested or telescoped casing strings complicates well abandonment. Inner strings should be removed when possible, but only when removal will not jeopardize the abandonment of the well. If inner strings cannot be removed and sealing of the annular space is required, then the inner string should be vertically split (plastic cased wells) or cut (metal-cased wells) at intervals necessary to insure complete filling of the annular space.
Damaged, poorly constructed or dilapidated wells may need to be redrilled in order to apply proper abandonment techniques. Also, in situations where intermixing of aquifers is likely, the borehole may need to be redrilled.
7.4 MATERIALS AND METHODS
7.4.1 Aggregate
Materials that eliminate the physical hazard and open space of the borehole, but do not prevent the flow of water through the well bore, are categorized as aggregate. Aggregates consist of sand, crushed stone or similar material that is used to fill the well. Aggregates should be uncontaminated and of consistent size to minimize bridging during placement.
Aggregate is usually not placed in wells smaller than two inches in diameter. Nominal size of the aggregate should be no more than 1/4 of the minimum well diameter through which it must pass during placement. Because aggregate is usually poured from the top of the well, care must be taken to prevent bridging by slowly pouring the aggregate and monitoring the progress with frequent depth measurements.
Aggregates may be used in the following circumstances: 1) there is no need to penetrate or seal fractures, joints or other openings in the interval to be filled, 2) a watertight seal is not required in the interval to be filled, 3) the hole is caving, 4) the interval does not penetrate a perched or confined aquifer, and 5) the interval does not penetrate more than one aquifer. If aggregate is used, a casing seal should be installed (see Section 7.5.1). The use of aggregate and a casing seal must be consistent with the future land use.
7.4.2 Sealants
Sealants are used in well abandonment to provide a watertight barrier to the migration of water in the well bore, in the annular spaces or in fractures and openings adjacent to the well bore. Sealants usually consist of portland cement based grouts, “bentonite” clay, or combinations of these substances. Additives are frequently used to enhance or delay specific properties such as viscosity, setting time, shrinkage, or strength.
Sealing mixtures should be formulated to minimize shrinkage and ensure compatibility with the chemistry of the groundwater in the well.
A grout pump and tremie pipe are preferred for delivering grout to the bottom of the well. This method insures the positive displacement of the water in the well, and will minimize dilution or separation of the grout.
If aggregate is to be placed above sealant, a sufficient amount of curing time should pass before placing the aggregate above the seal. Curing time for grout using Type 1 cement is typically 24 – 48 hours, and 12 hours for Type III cement.
General types of sealants are defined as follows:
Neat cement grout: Neat cement grout is generally formulated using a ratio of one 94 lb. bag of portland cement to no more than 6 gallons of water. This grout is superior for sealing small openings, for penetrating any annular space outside of the casings, and for filling voids in the surrounding rocks. When applied under pressure, neat cement grout is strongly favored for sealing artesian wells or those penetrating more than one aquifer. Neat cement grout is generally preferred to concrete grout because it avoids the problem of separation of the aggregate and the cement. Neat cement grout can be susceptible to shrinkage and the heat of hydration can possibly damage some plastic casing materials.
Concrete grout: Concrete grout consists of a ratio of not more than six gallons of water, one 94-lb. bag of Portland cement, and an equal volume of sand. This grout is generally used for filling the upper part of the well above the water bearing zone, for plugging short sections of casings, or for filling large-diameter wells.
Concrete grout, which makes a stronger seal than neat cement, may not significantly penetrate seams, crevices or interstices. Grout pumps can handle sand without being immediately damaged. Aggregate particles bigger than this may damage the pump. If not properly emplaced, the aggregate is apt to separate from the cement. Concrete grout should generally not be placed below the water level in a well, unless a tremie pipe and a grout pump are used.
Grout additives: Some bentonite (2 to 8 percent) can be added to neat cement or concrete grout to decrease the amount of shrinkage. Other additives can be used to alter the curing time or the permeability of the grout. For example, calcium chloride can be used as a curing accelerator.
High-solids sodium bentonite: This type of grout is composed of 15-20 percent solids content by weight of sodium bentonite when mixed with water. To determine the percentage content, the weight of bentonite is divided by the weight of the water plus the weight of the bentonite. For example, if 75 lbs. of powdered bentonite and 250 pounds of granular bentonite were mixed in 150 gallons of water (at 8.34 lbs. per gallon), the percentage of high-solids bentonite is approximately 20 percent (325/(1251+325)). High-solids bentonite must be pumped before its viscosity is lowered. Pumping pressures higher than those used for cement grouts are usually necessary. Hydration of the bentonite must be delayed until it has been placed down the well. This can be done by 1) using additives with the dry bentonite or in the water, 2) mixing calcium bentonite (it expands less) with sodium bentonite, or 3) using granular bentonite, which has less surface area.
In addition, positive displacement pumps such as piston, gear, and moyno (progressive cavity) pumps must be used because pumps that shear the grout (such as centrifugal pumps) will accelerate the congealing of the bentonite. A paddle mixer is typically used to mix the grout. A high-solids bentonite grout is not made from bentonite that is labeled as drilling fluid or gel.
Chip Bentonite: Chip (coarse grade) or pelletized bentonite can form adequate seals. This type of bentonite is poured directly down the borehole. The size of the bentonite chips also should be no more than 1/4 of the minimum well diameter through which it must pass during placement. Because of the potential for bridging, this material may not be suitable for deep wells or borings where positive displacement is necessary to seal the well.
When coarse bentonite is placed above the water level, water must be added frequently to hydrate the bentonite. Care must be taken with chip or pelletized bentonite to not overload the interval to be sealed. Rapidly swelling bentonite could result in incomplete hydration and a heterogeneous seal containing lumps of dry bentonite. The level of the bentonite should be checked often to make sure that bridging of the chips does not occur.
7.4.3 Bridge Seals
A bridge seal can be used to isolate cavernous sections of a well, to isolate two producing zones in the well, or to provide the structural integrity necessary to support overlying materials (and thus protect underlying aggregate or sealants from excessive compressive forces). Bridge seals are usually constructed by installing an expandable plug made of wood, neoprene, or a pneumatic or other mechanical packer. Additional aggregate can be placed above the bridge.
7.5 RECOMMENDATIONS
The complexity of the abandonment procedure depends primarily on the hydrogeology, geology, well construction, and the groundwater quality. Four principal complicating factors have been identified; they include 1) artesian conditions, 2) multiple aquifers, 3) cavernous rocks, and 4) the threat or presence of contamination. The recommended procedures for abandoning wells will be more rigorous with the presence of one or more complicating factors. The procedures may vary from a simple casing seal above aggregate to entirely grouting a well using a tremie pipe after existing casing has been ripped or perforated. Figure 10 summarizes the general approach to well abandonment.
7.5.1 Casing Seal
The transition from well casing to open borehole is the most suspect zone for migration of water. In order to minimize the movement of water (contaminated or otherwise) from the overlying less consolidated materials to the lower waterbearing units, this zone must be sealed. Generally this can be accomplished by filling at least the upper 10 feet of open borehole and the lower five feet of casing with sealant. The length of open borehole sealed should be increased if extenuating circumstances exist. Such circumstances would include a history of bacterial contamination, saprolitic bedrock, or possibly deep fracture zones. Waterbearing zones reported in the upper 20 feet or so of open borehole are indications of fractures and would warrant additional sealant. Casing that is deteriorated should be sealed along its entire length. If the casing is to be pulled the sealant used should remain fluid for a period of time adequate for removal of the casing.
If the casing is to remain, then whenever feasible, it should be cut off below land surface. After the casing seal discussed above achieves adequate strength, the open casing should at a minimum, be filled with aggregate. It is strongly suggested that a sealant be used in the upper 2 to 5 feet of casing.
7.5.2 Wells in Unconfined or Semi-Confined Conditions
These are the most common type of wells in Pennsylvania. The geology may consist of either unconsolidated or consolidated materials. When applicable, unconfined wells in non-contaminated areas may be satisfactorily abandoned using aggregate materials up to 10-15 feet below the ground surface. This would apply mainly to domestic wells, and test borings or wells not covered by existing regulations. Monitoring wells that are not covered by specific regulatory programs and are located at sites with no known contamination, might be abandoned in this manner. Above the aggregate, the casing seal should be installed. A sealant may be used over the entire depth.
7.5.3 Wells at Contaminated Sites
An abandoned, contaminated well often mixes contaminated groundwater with uncontaminated groundwater. Complete and uniform sealing of the well from the bottom to the surface is required. Therefore, proper well preparation (Section 7.3) must be done before the well is sealed with a proper sealant (Section 7.4.2).
7.5.4 Wells in Cavernous Rocks
Problems can arise when filling wells that penetrate cavernous rock. Although such wells are usually located in carbonate terrain, voids can also occur in areas that have been deep mined. Care must be taken to insure that aggregates and sealants are of a size and consistency to prevent their removal by water flowing in the void. Large voids or high flow velocities warrant placement of a bridge in competent rock over the void. Aggregate and sealants can then be placed above the bridge.
7.5.5 Multiple Aquifer Wells
The main goal in sealing wells that extend into more than one aquifer is to prevent the flow of groundwater from one aquifer to another. If no appreciable movement of water is encountered, and there is no threat of groundwater contamination, sealing with concrete, neat cement, grout, or alternating layers of these materials and aggregate will prove satisfactory. When groundwater velocities are high, the procedures for wells with artesian flow (see the next section) are recommended. If alternating plugs (or bridges) and aggregate layers are used, the plugs should be placed in known nonproductive horizons or, if locations of the nonproductive horizons are not known, at frequent intervals.
7.5.6 Flowing Wells
The sealing of artesian wells requires special attention. The flow of groundwater may be sufficient to make sealing by gravity placement of concrete, cement grout, neat cement, clay or sand impractical. In such wells, large stone aggregate (not more than 1/4 of the diameter of the hole), well packers (pneumatic or other), or wooden plugs will be needed to restrict the flow and thereby permit the gravity placement of sealing material above the zone where water is produced. If plugs are used, they should be several times longer than the diameter of the well to prevent tilting. Seals should be designed to withstand the maximum anticipated hydraulic head of the artesian aquifer.
Because it is very important in wells of this type to prevent circulation between water yielding zones, or loss of water to the surface or to the annular spacing outside of the casing, it is recommended that pressure grouting with cement be done using the minimum volume of water during mixing that will permit handling.
In wells in which the hydrostatic head producing flow to the surface is low, the movement of water may be stopped by extending the well casing to an elevation above the artesian pressure surface.
7.5.7 Wells with Complicating Factors at Contaminated Sites
Wells with one or more of the above complicating factors that are to be abandoned in areas with contaminated groundwater or in areas where the groundwater is at a high risk for future contamination, require the most rigorous abandonment procedures. In general, the entire length of these wells should be sealed.
When the threat of contamination has been established, the elimination of a potential flowpath is critical. For example, a contaminated well in a karst terrain must be carefully sealed to avoid worsening the situation. In general, the entire lengths of these wells should be sealed. In some situations, a bridge seal may have to be installed, and casing may have to be perforated. In each case, a prudent method should be selected that will eliminate all potential vertical flowpaths.
7.5.8 Monitoring Wells
Monitoring wells should be abandoned in accordance with the rules and regulations of the program under which they were installed and operated. Monitoring wells which do not fall under the jurisdiction of a regulatory program, or fall under a program that has no rules or regulations for abandonment, should be abandoned under the following guidelines.
Monitoring wells that were installed and continue to function as designed, can usually be abandoned in place. Exceptions would include wells whose design precludes complete and effective placement of sealant and wells in locations subject to future disturbance that could compromise the abandonment. In such instances all tubing, screens, casings, aggregate, backfilling, and sealant should be cleaned from the boring and the hole should be completely filled with an appropriate sealant.
Monitoring wells that are abandoned in place should be completely filled with sealant. Screened intervals can be backfilled with inert aggregate if sealant will alter the groundwater chemistry and thereby jeopardize ongoing monitoring at the facility. Intervals between screens, and between the last screen and the surface, must be filled with sealant. Generally, sealant must be emplaced from the bottom of the interval being sealed. Protective casings, riser pipes, tubing, and other appurtenances at the surface which could not be removed should be cut off below grade after the sealant has properly set. When the abandonment will be completed below the finished grade, the area of the boring should be covered with a layer of bentonite, grout, concrete, or other sealant before backfilling to grade.
7.6 EXISTING REGULATIONS AND STANDARDS
The Water Well Drillers License Act requires that the owner or consultant who is to abandon the well notify the department of the intent to decommission a well at least 10 days before the well is sealed or filled. Individual department bureaus may have specific regulations or guidelines.
The Bureau of Oil and Gas Management regulates the plugging of oil and gas wells. Plugging provisions for oil and gas wells in coal and non-coal areas are established in § 210 and § 211 of Act 223, and § 78.91 – 78.97 of Chapter 78. These sections describe methods that would stop any vertical flow of fluids or gas within the well bore. Alternate methods of plugging also are allowed if they would afford the same level of protection. Alternate methods must be approved before the plugging is initiated.
The Bureau of Mining and Reclamation regulates the abandonment of borings and wells associated with the mining of coal. Coal exploration holes must be abandoned according to the § 87.93 for surface mining of bituminous coal, § 88.83 for anthracite coal mining, § 89.54 for deep mining of bituminous coal, and § 90.93, coal refuse disposal.
The Bureau of Water Supply and Community Health uses the AWWA Standard A 100-90 for abandonment of public water supply wells. This standard is referenced in Section 3.3.5.11 of Part II of the Public Water Supply Manual.
We completed this project with the help of our friends at Partridge Well & Drilling!
Partridge Well & Drilling is a Jacksonville Well and Drilling Company that has been in business for over 120 years. We have a very long and rich history of excellent work and satisfied clients.
Our Mission
To provide the most professional, dependable and honest service to our customers utilizing the highest quality of product available.
Take Control of Your Future | Become a Dumpster.me Licensed Partner TODAY!
Join the Dumpster.me Team!
Always wanted to be your own boss? Now you can, with Dumpster.me. The founders of Dumpster.me have over 50 years of combined experience building successful waste companies. We know how the big names do it, and we’ll teach you their secrets and share proven techniques to compete with them. You’ll also have the power of the Dumpster.me brand supporting you from day one!
Learn How to Leverage Niche Markets in Your Area
Knowing the right place to spend your time and resources is essential for any business, especially for those just starting out. We will guide you to the most profitable niche markets with the quickest start-up time in your area. Interested in Roll-Off Dumpster hauling? Want to start your own Commercial Dumpster or Portable Sanitation business? Become a Dumpster.me Licensed Partner to learn how NOT to make the same mistakes as everyone else!
DOWNLOAD THIS PDF TO LEARN MORE
Get All the Tools for Success
You bring the drive to work hard and we’ll provide you all the tools you need to succeed as your very own waste hauler.
- Onsite Training
- Free Website with SEO for your location
- Real Leads in your area
- Support and so much more…
Head over to Dumpster.me/partnerships today to get started as a Licensed Partner
The post Take Control of Your Future | Become a Dumpster.me Licensed Partner TODAY! appeared first on AW Sites.
Thank a Veteran Today | Happy Veteran’s Day from Arwood Waste
Happy Veteran’s Day from Arwood Waste
“As we express our gratitude, we must never forget that the highest appreciation is not to utter words, but to live by them.” —John F. Kennedy
We pause today to remember the service of all veterans who have made our great freedoms possible. Our country simply would not be the same without you. Arwood Waste and our partners hold veterans and their families in high regard for their sacrifices and willingness to serve.
If we can ever serve you for Roll Off Dumpster Rentals, Portable Toilet Rentals, Commercial Dumpster Rentals, or Storage Rentals, call us at (888) 413-5105 Toll Free
May this day find you surrounded by gratitude, love, and comfort. Thank you for your service!
Photo: www.glynlowe.com via Flickr
The post Thank a Veteran Today | Happy Veteran’s Day from Arwood Waste appeared first on AW Sites.
Saluting the Marine Corps Who Keep Our Country Safe
“A Marine is a Marine. I set that policy two weeks ago – there’s no such thing as a former Marine. You’re a Marine, just in a different uniform and you’re in a different phase of your life. But you’ll always be a Marine because you went to Parris Island, San Diego or the hills of Quantico. There’s no such thing as a former Marine.”
–General James F. Amos, 35th Commandant of the U.S. Marine Corps
On November 10th, Marine Corps Day, Arwood Waste extends a special thank you to the men and women of the United States Marine Corps who are diligently protecting us and maintaining our freedom by air, land and sea. We appreciate all that you and your families sacrifice to keep us safe.
Watch the 240th Marine Corps Birthday Message
If you have served in the Marines or are currently serving, we thank you. If you know someone who serves in the United States Marine Corps or whenever you see a Marine, be sure to show your appreciation. Semper Fi!
Call us at (888) 413-5105 if we can ever serve you for Roll Off Dumpster Rentals, Portable Toilet Rentals, Commercial Dumpster Rentals, or Storage Rentals
Photo: MarineCorps NewYork
The post Saluting the Marine Corps Who Keep Our Country Safe appeared first on AW Sites.
Cleanup of Debris 389 Bird Rd Jackosnville Florida
The cleanup of old construction waste was completed for Burnham Construction this week. The project was under $9000.00. For a free quote please call 904-751-1628!
We Recycle 65% of Items We Remove
In addition to junk removal, we also recycle items such as plastics, old batteries, oil, paint, toxic materials, and other items. We also donate items that may be of use to others to local charities, so you can be assured your items will end up where they belong. Our services, which include:
What We Remove:
Removal of demolition debris, which can consist of wood, sheds, shingles, fencing, drywall, carpeting, tile, or concrete. Disposal of yard waste, including, but not limited to, leaves, topsoil and other dirt, brush, trees, gravel, and firewood. Disposal of household items, such as old appliances, water heaters, exercise equipment, computers, beds and mattresses, furniture, televisions, and air conditioner units. Removal of scrap metal objects, such as cars and trucks, vans, SUVs, motorcycles, motors, cast iron, steel brass, copper, aluminum, trailers, and old metal storage buildings. Removal of debris from construction sites Removal of construction debris from residential homes & apartments ETC…
The Process
From a single truck load to multiple truck loads, we load, haul, and clean up the junk from your residence or business.
Step 1: Book an appointmentCall us at 1.904.751.1628 or Schedule Online Now to arrange a removal time convenient for you. You choose what day you’d like us to come and when.
|
![]() |
Step 2: We provide an on-site, in person estimateOnce our team arrives, just tell us what needs to go. We’ll provide you an estimate on-site and upon your approval we are ready to start the work.
|
![]() |
Step 3: We haul off your junk and leave it clean!Once all your items our loaded, we sweep and make sure you area is clean and haul it off. |
![]() |
HHW FACILITY OR EVENT:
Household hazardous waste (HHW) facilities safely process and recycle potentially toxic wastes, such as e-waste, household cleaners, paint, chemicals, medicines, and liquids. Some communities host HHW events on an annual or biannual basis. Find the nearest HHW drop off location online by visiting Earth911.com.
Wet Home Demolition 6958-6968 Bakersfield Dr Jacksonville
The completion of the wet demolition of two residential homes located in the Jacksonville westside was completed for the City of Jacksonville code compliance division. For a free estimate please call 904-751-1628!
The Municipal Code Compliance Division enforces property maintenance, safety, and zoning codes, which affect the quality of life in Jacksonville. These laws address property nuisance, unsafe structures, residential/commercial minimum building standards, zoning, and (private property) junk vehicle violations.
Municipal Code Compliance enforces provisions of the Property Safety and Maintenance Codes and Zoning Codes, Jacksonville Ordinance Code Chapter 518, Chapter 656, and Chapter 741 respectively.
File an Issue of Concern
You may notify us of an issue online now. Please follow the steps to complete your concern, or you may call (904) 630-CITY (2489), and a customer service representative will receive your request for assistance and/or subsequent investigation by a Municipal Code Compliance Officer. Thank you for assisting us with improving the quality of life in Jacksonville.
Bryan Mosier, Chief
214 North Hogan Street, 1st Floor
Jacksonville, FL 32202
(904) 255-7000 | Fax: (904) 255-8920 | [email protected]
High reach demolition excavators are more often used for tall buildings where explosive demolition is not appropriate or possible. Excavators with shear attachments are typically used to dismantle steel structural elements. Hydraulic hammers are often used for concrete structures and concrete processing attachments are used to crush concrete to a manageable size, and to remove reinforcing steel. For tall concrete buildings, where neither explosive or high reach demolition with an excavator is safe or practical, the “inside-out” method is used, whereby remotely operated mini-excavators demolish the building from the inside, whilst maintaining the outer walls of the building as a scaffolding, as each floor is demolished.
To control dust, fire hoses are used to maintain a wet demolition. Hoses may be held by workers, secured in fixed location, or attached to lifts to gain elevation.
Loaders or bulldozers may also be used to demolish a building. They are typically equipped with “rakes” (thick pieces of steel that could be an I-beam or tube) that are used to ram building walls. Skid loaders and loaders will also be used to take materials out and sort steel.
The technique of Vérinage is used in France to weaken and buckle the supports of central floors promoting the collapse of the top part of a building onto the bottom resulting in a rapid, symmetrical, collapse.[1]
Salute to the Sailors Who Keep Our Country Safe
“It follows then as certain as that night succeeds the day, that without a decisive naval force we can do nothing definitive, and with it, everything honorable and glorious.” – George Washington
This year on Navy Day, Arwood Waste wants to thank those men and women in the United States Navy who work diligently to protect our seas and maintain our freedom. We appreciate all that you and your families sacrifice to keep us safe.
For those of you who were once in the Navy, are currently serving, or who know someone who serves in the United States Navy, we thank you for your service.
Call us at (888) 413-5105 if we can ever serve you for Roll Off Dumpster Rentals, Portable Toilet Rentals, Commercial Dumpster Rentals, or Storage Rentals
Photo: CNE CNA C6F via flickr
The post Salute to the Sailors Who Keep Our Country Safe appeared first on AW Sites.
Make Your Own Arwood Waste Garbage Truck Costume For Halloween!
Instead of the same old store-bought costume this year, try something NEW AND FUN! We love our sanitation workers and thank them for all they do every day to keep us safe and clean. This DIY costume is perfect for both kids and adults.
Check out this quick instructional video and download the step-by-step guide to make your own costume below. The PDF that you download will have the instructions and decals so you can easily make your very own costume.
Just like the men and women of the waste management industry collect our trash each day, it’s time for you to start collecting some CANDY and smiles!
Here’s What You’ll Need:
- One large cardboard box
- One smaller cardboard box
- Glue
- Ribbon
- Paint
- Paint brush
- Marker
DOWNLOAD INSTRUCTIONS & DECALS HERE
The post Make Your Own Arwood Waste Garbage Truck Costume For Halloween! appeared first on AW Sites.
Waste Services Alert | Hurricane Matthew Impact & Safety Reminders
We Apologize For Any Delays While We Restore Service
Arwood Waste, AW Waste Management and our partner waste companies in Florida, Georgia, South Carolina and North Carolina are hard at work to restore waste services to the affected areas in the wake of Hurricane Matthew. With widespread damage across large parts of 4 states, we understand that residents of these areas will have increased needs for debris cleanup in the coming weeks and we are working tirelessly to meet those needs.
Call Us At (888) 413-5105 If You Have Service Questions or Additional Waste Needs During This Cleanup Process
With our headquarters in Jacksonville, Florida, our staff takes the cleanup challenges you might be facing personally. As local landfills re-open and diesel fuel becomes available again in the Southeast U.S., we will continue working to restore scheduled waste services and meet the increased demand for debris cleanup in these areas.
Post Storm Clean Up Tips & Safety Reminders
As you clean up your home or business following this storm remember these debris clean up tips and safety reminders to keep you and your family out of harm’s way:
- Do not drive through flooded areas. Turn around, don’t drown!
- As you clean yard debris, watch out for falling items such as branches or trees limbs.
- Do not block roads or streets with waste and debris piles.
- Separate yard debris from household or structural debris piles for waste pickup.
- Consider hiring a demolition company such as Dependable Demolition for professional demolition debris clean up services.
- If possible, cut large trees and pieces of debris in to 4 foot segments. Note: It may take several trips for all debris to be removed.
- As flood waters recede watch out for snakes and other dangerous animals.
- Check for structural damage and watch out for falling drywall.
- If you need to use a generator, make sure it is outside and well ventilated to prevent the buildup of deadly fumes.
Arwood Waste is here to help with Roll Off Dumpsters and Portable Toilet Rentals.
Photo: Ninian Reid via Flickr
The post Waste Services Alert | Hurricane Matthew Impact & Safety Reminders appeared first on AW Sites.