Jacksonville Demolition Contractor

Demolition Services provided by Arwood Site Services

Call Today (904) 305-7534Demolition Experts in Jacksonville, FLDriveway & Swimming Pool RemovalFree Instant Online QuoteText 904-626-6663 For A Quote

cards-dk

Jacksonville, FL 32220

  • Home
  • Get a Quote
  • Our Locations
  • About
  • Got Demo?
  • News
  • Reviews
  • Contact
  • Demolition
  • Building Demolition
  • Swimming Pool Removal
  • Emergency Clean Up
  • Driveway Removal
  • Other Services
    • Roll Off Dumpsters
    • Commercial Dumpsters
    • Compactors
    • Curbside Collection
    • Portable Toilets
    • Fencing & Barricades

Partial Fill-In or Full Pool Removal in Jacksonville, FL? Costs, Permits and Steps

November 12, 2026

Short answer: In Jacksonville, most homeowners choose a partial fill-in (break out the top of the shell, punch drain holes, backfill and compact) because it costs less and finishes faster. Choose full removal if you might ever build, pour a slab or add on over the old pool. National cost guides list partial fill-ins at about $2,000 to $7,000 and full removals at about $9,000 to $19,000. Either way, the job needs a City of Jacksonville permit through JaxEPICS and a Sunshine 811 locate before any digging starts.

This guide covers swimming pool removal in Jacksonville: how each method works, the steps from drain-down to sod, the published cost ranges, and the City rules that apply. Arwood Site Services of Jacksonville does both partial and full removals for in-ground and above-ground pools.

What is the difference between a partial pool fill-in and a full pool removal?

A partial fill-in (also called abandonment) leaves the lower part of the pool shell in the ground. The crew drills or breaks holes in the floor so rainwater can drain, knocks down the top few feet of the walls and the deck into the cavity, then backfills with clean fill in compacted lifts. A full removal (also called exhuming) breaks up and hauls away the entire shell, deck and plumbing, then fills and compacts the whole hole.

  • Partial fill-in: lower cost, usually 1 to 3 days, but the area is generally treated as non-buildable and the fill-in must be disclosed when you sell.
  • Full removal: higher cost, usually 3 to 7 days, and leaves ground that can support future construction when it is properly compacted and documented.

Those timelines come from HomeAdvisor’s pool fill-in cost guide. Your own schedule depends on pool size, access for equipment and how quickly the permit and inspections clear.

Which method should a Jacksonville homeowner choose?

Match the method to what the yard will become:

Planned use of the old pool areaMethod that usually fitsWhy
Lawn, garden or open play spacePartial fill-inLowest cost; settlement risk is managed with drain holes and compacted lifts.
Patio, paver deck or light hardscapeEither; ask about compaction testingLight loads can work over a well-compacted fill, but get your designer’s opinion first.
Room addition, garage, ADU or any footingsFull removalFootings need solid, documented ground; a shell left in place can cause problems.
Selling the home soonFull removal is often the cleaner storyBuyers and inspectors ask about partial fill-ins; national guides note it must be disclosed.

Pool construction also matters. Angi notes that fiberglass pools always need full removal, and vinyl pools with metal frames need the frame taken out. Concrete or gunite pools, which are common in Jacksonville back yards, are the type most often eligible for a partial fill-in (Angi, updated Oct. 30, 2026). If you plan to build over the area, bring your general contractor into the decision before work starts.

How much does pool removal cost in Jacksonville?

We could not find a published, Jacksonville-only average, so the figures below are national published ranges from Angi and HomeAdvisor. They are not an Arwood Site Services price list. Your written quote depends on pool size, construction, deck area, access and fill needed.

ItemPublished rangeSource
Partial fill-in (in-ground)$2,000–$7,000 (average about $5,000)Angi; HomeAdvisor
Full removal (in-ground)$9,000–$19,000Angi; HomeAdvisor
Typical fill-in project overall$4,000–$12,000 (national average $8,000)Angi; HomeAdvisor
Above-ground pool removal$300–$800; up to $5,000 with a deck and backfillAngi; HomeAdvisor
Concrete deck removal, if billed separately$500–$1,700Angi; HomeAdvisor
Fill dirt$5–$15 per cubic yard, plus deliveryAngi
Topsoil$12–$55 per cubic yardAngi; HomeAdvisor
Reseeding grass afterwardAbout $400–$1,600Angi
Engineer, when requiredAbout $500 averageAngi, citing HomeAdvisor

To estimate fill volume, multiply length by width by average depth in feet, then divide by 27 for cubic yards. HomeAdvisor’s example of a 12 x 24 x 5-foot pool works out to about 53 cubic yards.

Do you need a permit to remove a pool in Jacksonville?

Yes. Pool demolition in the City of Jacksonville is permitted work, and all permit applications go through the City’s online system, JaxEPICS (see the City’s online permit submission page). Your contractor normally pulls the permit and schedules the inspections.

The City’s published fee schedule, Section 320.409, has a line for “Demolition of structures other than buildings” with these components (City of Jacksonville City Fees):

  • BID permit fee: $112.50
  • Resource management fee: $20.00
  • Landscape fee: 12% of the BID permit fee
  • Development Services fee: $37.50
  • C&D debris fee: $0.90 per $1,000 of construction cost
  • Plan review: 67% of the BID permit fee or $60, whichever is greater

A pool is not a building, so this is the schedule line that generally lines up with pool demolition. The Building Inspection Division makes the final call on permit type and fees, so confirm on your application. If the property is in a historic district, a demolition Certificate of Appropriateness that needs commission review is listed separately at $610 (Section 307.208).

What other Jacksonville and Florida rules apply?

  • Call Sunshine 811 first. Florida law requires a locate ticket at least two full business days before digging, and the state’s definition of digging includes structure demolition. When you hire a contractor, the contractor is responsible for the ticket (Sunshine 811 FAQs).
  • Private lines are not marked. Sunshine 811 members do not locate private lines such as pool plumbing, sprinkler lines, gas to a heater or wiring to pumps and lights. Point these out to your crew.
  • Disconnect utilities to pool equipment. Angi notes that many municipalities require pump and lighting wiring and any gas lines to be disconnected before demolition.
  • Disposal. Concrete debris that leaves the site is construction and demolition (C&D) debris. The City’s published landfill rate for C&D generated inside the city is $22.71 per ton (Section 380.303). Clean concrete is often recycled instead of landfilled.
  • Disclosure. Plan to tell future buyers about a filled-in pool, especially a partial fill-in. Keep the permit and final inspection records.

What are the steps in a Jacksonville pool removal?

  1. Site visit and written quote. We measure the pool and deck, check access for equipment and talk through partial versus full removal.
  2. Permit and locate. We apply in JaxEPICS and submit a Sunshine 811 ticket, then wait the required two full business days.
  3. Disconnect and drain. Pool equipment is disconnected and the water is pumped out.
  4. Break-out. For a partial fill-in, the floor is perforated for drainage and the top of the walls and the deck are broken into the cavity. For a full removal, the whole shell is broken up and hauled out.
  5. Backfill in compacted lifts. Clean fill goes in roughly a couple of feet at a time and is compacted by machine, with a slight crown left for settlement.
  6. Inspection and finish grading. After the City inspection, the area is graded. Topsoil, sod, seed or fence repair can be added if you want a turnkey finish.

How can you keep pool removal costs down?

  • Decide early what the area will be used for, so you don’t pay for a full removal you don’t need, or redo a partial fill-in later.
  • Clear patio furniture, toys and equipment out of the access path before the crew arrives.
  • Bundle nearby concrete work, such as an old patio or a driveway removal, into the same mobilization.
  • Ask whether the deck removal, fill, topsoil and sod are in the quote or priced separately.
  • Get the quote in writing with the method, fill type and compaction approach spelled out.

Frequently asked questions

How long does it take to remove a pool in Jacksonville?

The field work typically takes 1 to 3 days for a partial fill-in and 3 to 7 days for a full removal, according to HomeAdvisor. Add time for the permit and the required two-business-day Sunshine 811 wait.

Can I build on the spot where my pool was filled in?

After a full removal with proper compaction, usually yes. After a partial fill-in, the area is generally treated as non-buildable. If you plan an addition, garage or slab, choose full removal and involve your builder or engineer.

Is a partial pool fill-in allowed in Jacksonville?

National guides note that some cities require full removal. Confirm the method on your City of Jacksonville permit application, and with your HOA if you have one, before work begins.

What happens to the concrete from my pool?

In a partial fill-in, much of the broken shell and deck stays in the cavity under the fill. In a full removal, the concrete is hauled off. Clean concrete is often recycled, and anything landfilled is billed as C&D debris.

Do I have to remove an above-ground pool the same way?

No. Above-ground pools are usually drained and taken apart, and the debris is hauled off. Angi and HomeAdvisor list $300 to $800, or up to $5,000 when a deck and backfill are involved.

Will removing my pool lower my insurance or upkeep costs?

Angi lists lower insurance and no more maintenance among the reasons owners fill in pools, and estimates owners spend about $400 to $1,200 a year on pool-related costs. Check with your insurer for your own policy.

Get a free pool removal quote in Jacksonville

Ready to get your yard back? Arwood Site Services of Jacksonville will walk your pool, explain partial versus full removal for your lot, handle the permit and give you a written quote.

  • Call (904) 305-7534
  • Email [email protected]
  • Request online: Get a Quote

Learn more on our Swimming Pool Removal page. Need a container for other cleanup? See roll-off dumpsters.

Sources

  • Angi, How Much Does It Cost to Fill a Pool With Dirt? [2026 Data], updated Oct. 30, 2026
  • HomeAdvisor, How Much Does It Cost to Fill in a Pool in 2026?, updated June 20, 2026
  • City of Jacksonville, City Fees (Sections 320.409, 307.208 and 380.303)
  • City of Jacksonville, Online Permit Submission (JaxEPICS)
  • Sunshine 811, FAQs and When Can I Dig?

Cost figures are published national ranges from the sources above, checked November 11, 2026. They are not quotes from Arwood Site Services.

Share this post:

Share on X (Twitter) Share on Facebook Share on LinkedIn Share on Email

Filed Under: Got Demo?

Get an Easy Quote

cards-dk

Find Us On:

Angie's List

Home Advisor

Better Business Bureau Accredited

Dependable Demolition

Proudly Serving

Demolition Experts in Jacksonville, FLDriveway & Swimming Pool RemovalFree Instant Online QuoteText 904-626-6663 For A Quote

Jacksonville, FL 32220
(904) 305-7534
[email protected]
Call Today (904) 305-7534

Arwood Site Services, Inc. BBB Business Review

  • Demolition
  • Building Demolition
  • Swimming Pool Removal
  • Emergency Clean Up
  • Driveway Removal
  • Other Services
    • Roll Off Dumpsters
    • Commercial Dumpsters
    • Compactors
    • Curbside Collection
    • Portable Toilets
    • Fencing & Barricades

 

 

We accept all major credit cards

YV-Logo-250x66-Light-en

Serving Cities near Jacksonville, FL

Atlantic Beach, Bryceville, Callahan, Doctors Inlet, Fleming Island, Jacksonville, Jacksonville Beach, Middleburg, Neptune Beach, Orange Park, Ponte Vedra, Ponte Vedra Beach, Saint Johns    

Serving Zip Codes near Jacksonville, FL

32003, 32004, 32006, 32009, 32011, 32030, 32050, 32065, 32067, 32068, 32073, 32081, 32082, 32095, 32099, 32201, 32202, 32203, 32204, 32205, 32206, 32207, 32208, 32209, 32210, 32211, 32212, 32214, 32216, 32217, 32218, 32219, 32220, 32221, 32222, 32223, 32224, 32225, 32226, 32227
  • Home
  • FAQ
  • Get a Quote
  • News
  • Contact
  • Privacy Policy

Copyright © 2026 Jacksonville Demolition Contractor. All Rights Reserved.
Site Design: JDA Websites · Log in

Text Us
Call Now